Lake Boga Waterfront Development Cultural Heritage Management Plan

The Lake Boga Waterfront Development is a residential development on an area of the Lake Boga foreshore which contains sensitive Aboriginal places. In 2014 Heritage Insight prepared a Cultural Heritage Management Plan in extensive consultation with the developer, Northern Land Solutions and the Wemba Wamba Aboriginal community.

The resulting CHMP contained detailed recommendations for the protection and enhancement of significant Aboriginal places that could be achieved by the development. The recommendations allow for the continued participation of Wemba Wamba people in the management and protection of significant places and the construction of the housing development and the long term conservation of places of high cultural value.

© Heritage Insight 2017
53 Stubbs Street, Kensington VIC 3031
Telephone +61 3 9376 6569
Fax +61 3 9376 6525
 
66 Jennings Street, Kyneton VIC 3444
Telephone +61 3 8578 3779